Gravel Driveway Installation Guide

o3 Mini / AI Assistant
02/07/25, 14:04
* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more
Scope of Works
• Inspect site, measure driveway dimensions and assess overall condition
• Remove existing surface or debris as necessary and prepare the base
• Excavate, level the ground and install a proper drainage system if required
• Lay base course, apply gravel layers and compact thoroughly
• Clean the site and conduct a final quality inspection
Typical Cost
Charge Type | Low £ | High £ | Notes |
Site Survey / Base Prep | £150 | £300 | Initial assessment and removal works |
Labour per hour | £60 | £90 | Skilled gravel laying crew |
Materials | £40 | £80 | Gravel and aggregates |
TOTAL (most driveways come in here) | £800 | £2500 |
Time on Site
Typical gravel driveway installation spans 1–3 days, depending on weather conditions, site complexity and drainage requirements. Additional time may be needed for intricate layouts or unexpected ground issues.
Questions to Ask Your Tradie
• What is your experience with gravel driveway installations?
• Will you manage the removal and disposal of the existing surface?
• Are there any potential additional charges for site preparation or unforeseen issues?
How to Avoid Surprises
• Obtain a detailed written quote covering all aspects of the project
• Confirm that the base, drainage, and overall design meet site needs
• Clarify warranty terms for both labour and materials