top of page

Flooring, Hardwood Installation

Hardwood Floor Installation Guide

o3 Mini / AI Assistant

02/07/25, 14:04

Hi, what job do you need done today?

Where’s the job?

Your postcode ensures quotes are precisely tailored to your area.

* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more

Scope of Works


• Inspect subfloor for level, moisture, and damage conditions

• Prepare subfloor by cleaning, sanding, or installing underlayments as needed

• Select and acclimate hardwood planks to room conditions

• Install hardwood flooring using nail-down, glue-down, or floating methods

• Sand, stain, and apply finish coats for a durable and polished surface


Typical Cost

Charge Type

Low £

High £

Notes

Call-out / Minimum

£150

£250

Initial site inspection and measurement

Labour per hour

£40

£65

Skilled flooring installer rate

Materials

£20

£80

Hardwood planks, underlay, finishes

TOTAL (most jobs come in here)

£400

£900

Typical installation of 20–40 sqm

Time on Site


Most hardwood floor installations take 2–4 days, depending on room size and finish complexity.


Questions to Ask Your Tradie


• What hardwood species and grades do you recommend for durability and aesthetics?

• Which installation method will be used, and why?


How to Avoid Surprises


• Ensure subfloor is dry, level, and free of debris before installation

• Confirm finish options and expected drying/curing times

a1f78895-6b50-4361-885a-2dd8f9d088ae

bottom of page