Overview

 

 

• Installing rooftop solar panel systems to generate renewable electricity using photovoltaic cells.

• Skill level: 4 / 5 (requires precise mounting, electrical wiring and roof integrity assessment).

• Typical duration: 1 – 4 days depending on system size, roof complexity and weather conditions.

 

 

Safety First

 

 

• Always assess roof stability and use proper fall protection gear (harness, helmets and secure ladders).

• Confirm all electrical connections are de-energised before commencing any installation works.

• Wear gloves and non-slip footwear to prevent injuries from handling panels and tools.

• Avoid working in high winds or wet conditions to reduce the risk of falls.

• Regularly inspect mounting hardware and roof attachments for secure fixings.

 

 

Tools & Materials

 

 

Item

Purpose

Solar panels & mounting brackets

Convert sunlight into electrical energy and secure panels to the roof

Inverter & wiring kit

Convert DC power to AC and establish system connections

Roof assessment tools

Ensure the roof can bear the additional load and is in sound condition

Safety harness & ladder

Facilitate safe access to the roof

Multimeter

Check electrical continuity and performance of the system

 

 

Step-by-Step

 

 

1. Assess roof suitability – conduct a shading analysis and verify the structural integrity.

2. Secure planning permissions and necessary permits in line with local regulations.

3. Install mounting brackets and rails – ensure they are firmly fixed to the roof structure.

4. Mount the solar panels – position them for optimal sun exposure and secure them to the brackets.

5. Connect the inverter and wiring – ensure all electrical components are correctly installed with RCD protection.

6. Test the system – check voltage, current and inverter display to confirm proper operation.

7. Complete final connections and schedule a safety inspection to certify the installation.

 

 

Completion Checks

 

 

• All panels are securely mounted with no movement or looseness.

• Electrical wiring is neat, with no exposed connections or errors on the inverter.

• System performance meets expected output levels as per inverter readings.

• The roof remains watertight and structurally sound following installation.

 

 

When to Call a Pro Instead

 

 

If rooftop solar installation involves complex roof reinforcement, intricate electrical setups or regulatory inspections, engaging a certified installer or a NICEIC-registered electrician is recommended for compliance and safety.