Home Scaffolding With Permit Costs
Scope of Works
Conduct pre‑start site survey and measure height, length and ground conditions.
Provide risk assessment, method statement and design to TG20:21 standards.
Arrange and pay for the required highway/pavement permit, plus any parking suspensions.
Deliver tubes, boards and fittings; erect scaffold with toe‑boards, guard‑rails and ties.
Fit access ladder gates, debris netting or protective fans where specified.
Carry out weekly statutory inspections and tag the structure.
Dismantle, load out and remove all materials; leave site tidy and sign‑off paperwork.
Typical Cost (inc. VAT)
Charge type | Low £ | High £ | Notes |
Call‑out / minimum | 200 | 400 | Standard erection/dismantle fee TradesmenCosts.co.uk |
Labour per hour | 35 | 60 | Crew charge based on £280–£320 day rate Checkatrade |
Materials (4‑week hire) | 900 | 1,600 | 2‑storey semi, three elevations, incl. hire & fixings Checkatrade |
Disposal | 0 | 50 | Waste wood, netting off‑cuts |
Extras – council permit & parking | 400 | 700 | Typical pavement licence £434–£683 rbkc.gov.uk |
TOTAL (most jobs come in here) | 1,500 | 2,600 | Full scaffold + permit for a 2‑storey house |
Figures reflect rounded 2025 UK averages from Checkatrade cost guides and London council licence fees.
Time on Site
½ – 1 day to erect and tag; 1–2 hours to dismantle.
Longer if: limited access for lorry, complex shapes (L‑sections, conservatory bridges), extra lifts above 6 m, or delayed permit approval.
Questions to Ask Your Trade
Are you NASC‑member or TG20:21 compliant?
Will the quoted price include the council permit and any parking suspensions?
How many weeks of hire are covered before extra rental kicks in?
Do you carry out and log weekly inspections or is that my responsibility?
What public‑liability cover do you hold for work at height and over the highway?
Can you supply edge protection, debris netting or alarm sensors if needed?
How soon after notice can you strike the scaffold to stop further hire fees?
How to Avoid Surprises
Confirm clear lorry access (3 m width, 4 m height) and reserve parking bays.
Advise neighbours and arrange access through side paths or shared drives.
Check whether a power‑line isolation or proximity agreement is required.
Allow lead‑in time (5–15 working days) for council permit approval.
Keep pets and children away during erection and dismantling.
All prices are 2025 GBP and include VAT.