Scope of Works
Â
Â
• Inspect glass shower screen, door and frames for faults or damage
Â
• Accurately measure openings and mounting points to ensure a proper fit
Â
• Remove old fittings, seals and any damaged glass as required
Â
• Install new glass panels or repair and re-seal the existing screen as appropriate
Â
• Reassemble frames, reapply silicone sealant and test door operation for smooth movement
Â
Typical Cost
Â
Â
Charge Type | Low ÂŁ | High ÂŁ | Notes |
|---|---|---|---|
Call-out / Minimum | ÂŁ100 | ÂŁ150 | First 30 min on site |
Labour per hour | ÂŁ60 | ÂŁ90 | Skilled glass fitter rate |
Materials | ÂŁ20 | ÂŁ50 | Glass, sealant & fittings |
TOTAL (most jobs come in here) | ÂŁ200 | ÂŁ450 |
Time on Site
Â
Most glass shower screen installations or repairs take 2–3 hours. Additional time may be required for custom fittings or complex adjustments.
Â
Questions to Ask Your Tradie
Â
• How will you ensure a secure and waterproof installation?
• Do you offer a warranty on the glass and sealants used?
Â
How to Avoid Surprises
Â
• Clear the shower area of personal items and obstacles before installation.
• Verify all measurements and access points with your tradie prior to work commencing.