Scope of Works

 

 

• Inspect glass shower screen, door and frames for faults or damage

 

• Accurately measure openings and mounting points to ensure a proper fit

 

• Remove old fittings, seals and any damaged glass as required

 

• Install new glass panels or repair and re-seal the existing screen as appropriate

 

• Reassemble frames, reapply silicone sealant and test door operation for smooth movement

 

Typical Cost

 

 

Charge Type

Low £

High £

Notes

Call-out / Minimum

£100

£150

First 30 min on site

Labour per hour

£60

£90

Skilled glass fitter rate

Materials

£20

£50

Glass, sealant & fittings

TOTAL (most jobs come in here)

£200

£450


Time on Site

 

Most glass shower screen installations or repairs take 2–3 hours. Additional time may be required for custom fittings or complex adjustments.

 

Questions to Ask Your Tradie

 

• How will you ensure a secure and waterproof installation?

• Do you offer a warranty on the glass and sealants used?

 

How to Avoid Surprises

 

• Clear the shower area of personal items and obstacles before installation.

• Verify all measurements and access points with your tradie prior to work commencing.

 