Scope of Works
• Inspect glass shower screen, door and frames for faults or damage
• Accurately measure openings and mounting points to ensure a proper fit
• Remove old fittings, seals and any damaged glass as required
• Install new glass panels or repair and re-seal the existing screen as appropriate
• Reassemble frames, reapply silicone sealant and test door operation for smooth movement
Typical Cost
Charge Type | Low £ | High £ | Notes |
|---|---|---|---|
Call-out / Minimum | £100 | £150 | First 30 min on site |
Labour per hour | £60 | £90 | Skilled glass fitter rate |
Materials | £20 | £50 | Glass, sealant & fittings |
TOTAL (most jobs come in here) | £200 | £450 |
Time on Site
Most glass shower screen installations or repairs take 2–3 hours. Additional time may be required for custom fittings or complex adjustments.
Questions to Ask Your Tradie
• How will you ensure a secure and waterproof installation?
• Do you offer a warranty on the glass and sealants used?
How to Avoid Surprises
• Clear the shower area of personal items and obstacles before installation.
• Verify all measurements and access points with your tradie prior to work commencing.