Find the best tradesperson near me
Get 3 quotes in just 1 minute
* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more
Scope of Works
• Prepare and level site, including excavation for pool placement
• Construct pool shell from concrete, fibreglass or vinyl as specified
• Install plumbing, drainage and electrical connections for pool equipment
• Apply finishing touches including tiling, coping and decking
Typical Cost
Charge Type | Low £ | High £ | Notes |
|---|---|---|---|
Initial consultation & design | £500 | £1,500 | Site analysis, design and permits |
Excavation & base preparation | £2,000 | £5,000 | Includes site levelling and excavation works |
Pool shell construction | £8,000 | £15,000 | Concrete or specialised pool shell build |
Finishing & fittings | £3,000 | £8,000 | Tiling, coping, decking & pool equipment |
TOTAL (typical projects) | £13,500 | £29,500 |
Time on Site
Swimming pool construction projects typically span several weeks – from initial excavation to final finishes. Smaller, standard projects often require 4–8 weeks, while bespoke designs may take longer.
Questions to Ask Your Tradie
• Can you provide examples of previous swimming pool projects you have completed?
• What type of pool construction methods and materials do you specialise in?
How to Avoid Surprises
• Ensure you have a detailed, written contract outlining materials, timeline and payment milestones.
• Verify that all permits and regulatory requirements have been secured prior to work commencing.
98b49aa7-644b-4157-af6e-307c15e19f60

