Solar Thermal Installation Process
Get 3 quotes in just 1 minute

o3 Mini / AI Assistant
02/07/25, 14:04
* This article may contain content generated by AI and may include errors. Learn more

Watch our Video Guide

Â
Â
Scope of Works
Â
• Conduct a site assessment of the roof, loft and boiler area to determine system feasibility
Â
• Design an optimised layout for solar thermal panels and the accompanying piping system
Â
• Install solar thermal panels, necessary piping, controls and integration with the existing hot water system
Â
• Commission the system with performance checks and safety verifications
Â
Typical Cost
Â
Â
Charge Type | Low ÂŁ | High ÂŁ | Notes |
|---|---|---|---|
Site visit / Consultation | ÂŁ100 | ÂŁ150 | Pre-installation inspection and design advice |
Labour per hour | ÂŁ50 | ÂŁ75 | Skilled installer rate |
Materials & Equipment | ÂŁ1000 | ÂŁ3000 | Panels, piping, controllers and integration parts |
TOTAL (typical installation) | ÂŁ2000 | ÂŁ5000 | Inclusive of installation and commissioning |
Time on Site
Â
Most domestic solar thermal system installations take 1–2 days. Additional time may be required for complex roof mounting or integration with older heating systems.
Â
Questions to Ask Your Tradie
Â
• What certifications and experience do you have in solar thermal installations?
• Can you provide references from previous domestic hot water system installations?
• Will you offer a workmanship warranty on the complete installation?
Â
How to Avoid Surprises
Â
• Ensure all roof access and boiler room areas are clear before installation begins
• Confirm the system design and panel positioning suit your property’s layout
Â