Scope of Works
• Inspect wind turbine components and site conditions for suitability
• Prepare foundation and mounting structures to ensure stability
• Assemble turbine blades, nacelle, and tower sections on site
• Connect electrical systems, perform calibration, and conduct operational tests
Typical Cost
Charge Type | Low £ | High £ | Notes |
Call-out / Initial Site Inspection | £150 | £250 | Site suitability assessment |
Labour per hour | £70 | £100 | Skilled turbine technician rate |
Materials & Equipment | £500 | £1,200 | Mounting hardware, wiring, cabling |
TOTAL (typical installation) | £1,000 | £2,500 |
Time on Site
Most wind turbine installations take between 1 and 3 days depending on turbine size and site complexity. Additional time may be needed for foundation curing or electrical grid connection.
Questions to Ask Your Installer
• What turbine model and capacity do you recommend for my location and energy needs?
• What warranties and maintenance services are included with installation?
How to Avoid Surprises
• Confirm all site preparation requirements and access conditions beforehand
• Verify permits and grid connection approvals are in place before installation