Deep Foundation Pile Driving Guide

o3 Mini / AI Assistant

02/07/25, 14:04

* This article may contain content generated by AI and may include errors. Learn more

Find the best tradesperson near me

Get 3 quotes in just 1 minute

Pink Poppy Flowers

Where is the job?

Hi, what job do you need done today?

Where’s the job?

Your postcode ensures quotes are precisely tailored to your area.

Watch our Video Guide

banner_RAQ_desktop_bulletpoints.png

 

 

Scope of Works

 

 

• Evaluate site conditions and design the optimal pile driving plan

 

• Mobilise specialist pile driving equipment and qualified operatives

 

• Establish safety zones and perform comprehensive site surveys

 

• Execute pile driving using either impact or vibratory methods

 

• Monitor pile integrity and adjust driving parameters as required

 

• Finalise installation with quality checks and site reinstatement

 

Typical Cost

 

 

Charge Type

Low £

High £

Notes

Call-out / Minimum

£250

£400

Setup, site survey and safety compliance

Labour per hour

£100

£150

Skilled operator with industry experience

Equipment / Materials

£300

£600

Includes equipment hire and ancillary materials

TOTAL (most jobs come in here)

£650

£1150


Time on Site

 

Deep foundation pile driving typically takes between 3–6 hours, though complex sites may require additional time.

 

Questions to Ask Your Tradie

 

• Are you licensed and experienced in deep foundation pile driving?

• Which installation methods do you recommend—impact or vibratory?

 

How to Avoid Surprises

 

• Confirm site access, permissions and any environmental assessments beforehand

• Ensure all safety protocols and site surveys are in place prior to commencement

 