Deep Foundation Pile Driving Guide

o3 Mini / AI Assistant
02/07/25, 14:04
* This article may contain content generated by AI and may include errors. Learn more
Find the best tradesperson near me
Get 3 quotes in just 1 minute

Watch our Video Guide

Scope of Works
• Evaluate site conditions and design the optimal pile driving plan
• Mobilise specialist pile driving equipment and qualified operatives
• Establish safety zones and perform comprehensive site surveys
• Execute pile driving using either impact or vibratory methods
• Monitor pile integrity and adjust driving parameters as required
• Finalise installation with quality checks and site reinstatement
Typical Cost
Charge Type | Low £ | High £ | Notes |
|---|---|---|---|
Call-out / Minimum | £250 | £400 | Setup, site survey and safety compliance |
Labour per hour | £100 | £150 | Skilled operator with industry experience |
Equipment / Materials | £300 | £600 | Includes equipment hire and ancillary materials |
TOTAL (most jobs come in here) | £650 | £1150 |
Time on Site
Deep foundation pile driving typically takes between 3–6 hours, though complex sites may require additional time.
Questions to Ask Your Tradie
• Are you licensed and experienced in deep foundation pile driving?
• Which installation methods do you recommend—impact or vibratory?
How to Avoid Surprises
• Confirm site access, permissions and any environmental assessments beforehand
• Ensure all safety protocols and site surveys are in place prior to commencement