top of page

Ground Source Heat Pump Installation Guide

o3 Mini / AI Assistant

02/07/25, 14:04

Find the best tradesperson near me

Get 3 quotes in just 1 minute

Where is the Job?

Step 1/3

Hi, what job do you need done today?

Where’s the job?

Your postcode ensures quotes are precisely tailored to your area.

* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more

 

 

Scope of Works

 

 

• Survey the site to determine the most suitable location for the heat pump unit and boreholes.

 

• Excavate boreholes or trenches as required for the ground loop system.

 

• Install the ground loop piping and position the heat pump unit accordingly.

 

• Connect the heat pump to your building’s heating system and test for efficiency.

 

Typical Cost

 

 

Charge Type

Low £

High £

Notes

Consultation / Site Survey

£200

£400

Initial evaluation and planning

Labour per day

£150

£250

Rates for skilled installer

Materials & Equipment

£3,000

£6,000

Includes heat pump, piping and controls

TOTAL (most jobs come in here)

£3,350

£6,650


Time on Site

 

Most ground source heat pump installations take 2–3 days, with additional time required for excavation and system calibration.

 

Questions to Ask Your Tradie

 

• Which heat pump model do you recommend for my property?

• Are all planning permissions and permits in place for the ground works?

 

How to Avoid Surprises

 

• Prepare the site by clearing access routes and ensuring safe excavation conditions.

• Confirm ground conditions and soil type prior to commencing excavation.

 

3363ea9a-4cdc-468c-a288-cf6d0442d181

bottom of page