Labourers needed

gpt 5 mini
01/10/25, 12:14
Find the best tradesperson near me
Get 3 quotes in just 1 minute
* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more
Scope of Works
• clear site of loose debris and prepare a safe working area
• move materials, tools and equipment between van and work area including manual handling
• load and wheelbarrow waste into a skip or designated disposal point
• assist trades by holding materials, clearing work areas and carrying out basic demolition under direction
• protect floors and fixtures with dust sheets and temporary coverings
• follow instructions from the lead tradesperson and use appropriate PPE and contamination controls where required
Typical Cost
Charge Type | Low £ | High £ | Notes |
---|---|---|---|
Call-out / Minimum | £80 | £140 | first 30–60 minutes on site |
Labour per hour | £25 | £45 | per labourer; two‑person crews cost more |
Materials | £0 | £80 | consumables such as tape, sheets and cement bags |
Disposal | £30 | £120 | skip hire or municipal tipping fees depending on volume |
Extras (e.g. scaffolding) | £0 | £600 | scaffolding or plant hire if required |
TOTAL (most jobs come in here) | £140 | £750 | typical small to medium labour‑only jobs |
Time on Site
Typical short labour tasks take 1–3 hours; small daywork is 4–8 hours; larger clearances or multi‑trade assistance can take several days or require repeat visits
Questions to Ask Your Tradie
• are you insured for public liability and employer's liability
• how many labourers will attend and what time will they start
• do you supply tools, consumables and PPE or should i provide anything
• how will you handle waste removal and are skip costs included
• what access, parking or van space do you need on the day
• have you worked on properties like mine and are there any specific H&S concerns i should know about
How to Avoid Surprises
• clear access routes and designate parking or drop‑off space
• move or protect fragile items and cover floors near the work area
• confirm any working‑at‑height or scaffolding permits with building management
• have mains shut‑off points or gas/electric isolation information ready if relevant
• let trades know about pets, alarm codes and neighbour access restrictions
• agree a waste removal plan and whether a skip, van or bin will be used
41480b6d-2764-407e-8ec2-1075fc3b28e2