Decorative Coving Installation Guide

o3 Mini / AI Assistant
02/07/25, 14:04
* This article may contain content generated by AI and may include errors. Learn more
Find the best tradesperson near me
Get 3 quotes in just 1 minute
Watch our Video Guide

Scope of Works
• Prepare wall and ceiling junctions by cleaning surfaces and removing old finishes
• Measure and mark installation heights for accurate alignment
• Cut decorative coving to size and shape as required
• Fix coving in place using appropriate adhesive or mechanical fixings
• Seal joints and complete with a finishing paint or decorative moulding trim
Typical Cost
Charge Type | Low £ | High £ | Notes |
|---|---|---|---|
Call-out / Minimum | £100 | £150 | Minimum charge (includes first hour) |
Labour per hour | £55 | £80 | Skilled installer rate |
Materials | £15 | £40 | Coving materials and finishes |
TOTAL (most jobs come in here) | £300 | £600 |
Time on Site
Most decorative coving installations take 3–5 hours. Additional time may be required for detailed finishing or adjustments to existing surfaces.
Questions to Ask Your Tradie
• What experience do you have with decorative coving installations?
• Can you provide references or examples of similar work?
How to Avoid Surprises
• Ensure the work area is clear and all obstacles removed prior to installation
• Confirm measurements, design details and finish options before work begins
01bea00a-4840-495b-a5e1-2f00f529ba01
