top of page

Plug socket installation

gpt 5 mini

01/10/25, 12:14

* This article may contain content generated by AI and may include errors. Learn more

Find the best tradesperson near me

Get 3 quotes in just 1 minute

Pink Poppy Flowers

Where is the job?

Hi, what job do you need done today?

Where’s the job?

Your postcode ensures quotes are precisely tailored to your area.

Watch our Video Guide

banner_RAQ_desktop_bulletpoints.png

 

 

Scope of Works

 

• Isolate the circuit at the consumer unit and confirm power off

• Inspect the planned location and route cable from the nearest live circuit or consumer unit

• Cut chases or surface-run cable, install a suitable back box and mount the socket

• Make good surrounding plaster or fit a pattress box and seal cable entries

• Test for correct polarity, earth continuity and RCD operation and label the circuit

• Clear debris, remove small waste and use PPE and safe electrical working practices

 

Typical Cost

 

Charge Type

Low £

High £

Notes

Call-out / Minimum

£70

£120

First 30–60 minutes on site

Labour per hour

£50

£90

Qualified electrician rate, VAT inclusive

Materials

£10

£70

Socket, back box, cable and small fittings

Disposal

£0

£30

Small waste removal; skip hire if major chasing

Extras (e.g. chasing, scaffolding)

£0

£300

Chasing, new radial circuit, or scaffolding where required

TOTAL (most jobs come in here)

£140

£420

Typical single new socket or relocation; larger jobs cost more

 

Time on Site

 

Most single‑socket installations take 1–3 hours on site including testing and tidying. Jobs that need a new radial circuit, extensive chasing through solid masonry, consumer unit alterations or scaffolding can take a day or more

 

Questions to Ask Your Tradie

 

• Are you a registered electrician and can you provide Part P / BS 7671 certification?

• Will you isolate and test the circuit and provide a written test report on completion?

• Do you need access to the consumer unit or will a new circuit be required and how much will that add to the price?

• How will you protect floors and joinery and will you clear plaster dust after chasing?

• What extras might be charged (chasing, re-plastering, scaffolding, consumer unit work)?

• Do you carry public liability insurance and what are your payment and guarantee terms?

 

How to Avoid Surprises

 

• Show where the consumer unit is and ensure access on the day

• Clear the area around the planned socket and cover furniture and floors

• Confirm parking close to the property for a van and an uninterrupted work period

• Mention if the property has asbestos, loft insulation or restricted access

• Check whether building management permits or notices are needed for flats

• Agree in writing the testing and certification you expect and where the certificate will be left

cfc8482b-0aa6-466c-8a59-f101d9176b6f

bottom of page