Concrete Floor Screeding Guide
Get 3 quotes in just 1 minute

o3 Mini / AI Assistant
02/07/25, 14:04
* This article may contain content generated by AI and may include errors. Learn more

Watch our Video Guide

Â
Â
Scope of Works
Â
Â
• Inspect existing concrete base and assess moisture levels
Â
• Prepare subfloor by cleaning, levelling and applying primer where necessary
Â
• Mix and apply the concrete floor screed to achieve a level surface
Â
• Allow sufficient curing time and apply finishing touches as required
Â
Typical Cost
Â
Â
Charge Type | Low ÂŁ | High ÂŁ | Notes |
|---|---|---|---|
Call-out / Minimum | ÂŁ100 | ÂŁ150 | Initial consultation, up to 45 mins on site |
Labour per hour | ÂŁ60 | ÂŁ85 | Skilled floor screeding specialist |
Materials | ÂŁ20 | ÂŁ40 | Screed mix, primer and additives |
TOTAL (most jobs come in here) | ÂŁ250 | ÂŁ450 |
Time on Site
Â
Most concrete floor screeding jobs take between 3–5 hours. Larger areas or additional preparation work may require extra time.
Â
Questions to Ask Your Tradie
Â
• What screed mix proportions do you use for the best results?
• Have you carried out a moisture test on the subfloor before screeding?
Â
How to Avoid Surprises
Â
• Clear the work area of furniture and debris
• Confirm that all necessary access points and services are available
Â

Find the best tradesperson near me
Get 3 quotes in just 1 minute

Vetted Tradespeople
Free Quotes
Quick Turnaround
262d7b87-f993-44d4-b896-829e5d4a7e12

