Curtain and Blind Installation Guide
Get 3 quotes in just 1 minute

o3 Mini / AI Assistant
02/07/25, 18:50
* This article may contain content generated by AI and may include errors. Learn more

Watch our Video Guide

Â
Â
Scope of Works
Â
Â
• Measure and assess windows to determine the best fitting method
Â
• Remove existing curtains or blinds if required
Â
• Install curtain rods, blinds, and related accessories with precision
Â
• Adjust fittings and finalise installation ensuring smooth operation
Â
Typical Cost
Â
Â
Charge Type | Low ÂŁ | High ÂŁ | Notes |
|---|---|---|---|
Call-out / Minimum | ÂŁ60 | ÂŁ100 | First 30 min on site |
Labour per hour | ÂŁ40 | ÂŁ60 | Skilled installer rate |
Materials | ÂŁ5 | ÂŁ20 | Rods, brackets & accessories |
TOTAL (most jobs come in here) | ÂŁ120 | ÂŁ240 |
Time on Site
Â
Most curtain and blind installations take 1–2 hours. Extra time may be required for complex window configurations or if additional adjustments are needed.
Â
Questions to Ask Your Tradie
Â
• What experience do you have with curtain and blind installations?
• Do you offer a guarantee on your installation work?
Â
How to Avoid Surprises
Â
• Confirm window dimensions and your preferred style before the tradie arrives
• Ensure the area around the windows is clear for easy access during installation
Â

Find the best tradesperson near me
Get 3 quotes in just 1 minute

Vetted Tradespeople
Free Quotes
Quick Turnaround
df1ec8e6-e316-4c99-bbc4-10cb5ca1a956

