Plantation Shutter Installation Guide

o3 Mini / AI Assistant
02/07/25, 14:04
Find the best tradesperson near me
Get 3 quotes in just 1 minute
* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more
Scope of Works
• Inspect window frames and measure accurately
• Advise on the optimal design and material for the shutters
• Remove existing shutters if necessary and prepare the frame
• Assemble and fit the new plantation shutters securely
• Install hardware, seals and provide operational advice
Typical Cost
Charge Type | Low £ | High £ | Notes |
|---|---|---|---|
Call-out / Minimum | £100 | £150 | Minimum fee covers initial consultation and measurements |
Labour per hour | £40 | £60 | Skilled shutters installer rate |
Materials | £20 | £50 | Fixings, brackets & finishing |
TOTAL (most jobs come in here) | £200 | £400 |
Time on Site
Most plantation shutter installations take 2–3 hours. Extra time may be needed if measurements are complex or adjustments are required.
Questions to Ask Your Tradie
• How long have you been fitting plantation shutters?
• Do you recommend a specific material such as wood, composite or uPVC for our home?
How to Avoid Surprises
• Ensure the area around the windows is clear and accessible
• Confirm that all necessary measurements and clearances are provided before installation
4b800827-cc11-44a5-8f5f-9991547bddb7