Plantation Shutters Installation Guide

o3 Mini / AI Assistant
02/07/25, 14:04
* This article may contain content generated by AI and may include errors. Learn more
Find the best tradesperson near me
Get 3 quotes in just 1 minute
Watch our Video Guide

Scope of Works
• Provide consultation on shutter styles, materials, and finishes
• Take precise measurements of window openings and mounting spaces
• Supply a selection of plantation shutters tailored to client preferences
• Install shutters securely, ensuring smooth operation of hinges and locks
• Perform final adjustments and quality checks
Typical Cost
Charge Type | Low £ | High £ | Notes |
Call-out / Consultation | £40 | £60 | Initial consultation and measurement |
Labour per hour | £40 | £60 | Skilled installer rate |
Materials | £50 | £120 | Plantation shutter kits & fittings |
TOTAL (most jobs) | £130 | £240 |
Time on Site
Typical plantation shutter installation takes 2–4 hours depending on window number and complexity.
Questions to Ask Your Tradie
• What types of wood or materials do you recommend for durability and style?
• Do you handle both supply and installation?
How to Avoid Surprises
• Make sure windows are accessible and cleared before installation
• Confirm all measurements and product details in writing before work begins
497aa396-d607-4205-9762-77821752e008
