top of page
Branding-V1-NearMeTrades-1.png

Plantation Shutters Installation Guide

Get 3 quotes in just 1 minute

Where is the Job?

o3 Mini / AI Assistant

02/07/25, 14:04

* This article may contain content generated by AI and may include errors. Learn more

Pink Poppy Flowers

Hi, what job do you need done today?

Where’s the job?

Your postcode ensures quotes are precisely tailored to your area.

Watch our  Video Guide 

banner_RAQ_desktop_bulletpoints.png

Scope of Works


• Provide consultation on shutter styles, materials, and finishes

• Take precise measurements of window openings and mounting spaces

• Supply a selection of plantation shutters tailored to client preferences

• Install shutters securely, ensuring smooth operation of hinges and locks

• Perform final adjustments and quality checks


Typical Cost

Charge Type

Low £

High £

Notes

Call-out / Consultation

£40

£60

Initial consultation and measurement

Labour per hour

£40

£60

Skilled installer rate

Materials

£50

£120

Plantation shutter kits & fittings

TOTAL (most jobs)

£130

£240


Time on Site


Typical plantation shutter installation takes 2–4 hours depending on window number and complexity.


Questions to Ask Your Tradie


• What types of wood or materials do you recommend for durability and style?

• Do you handle both supply and installation?


How to Avoid Surprises


• Make sure windows are accessible and cleared before installation

• Confirm all measurements and product details in writing before work begins

Find the best tradesperson near me

Get 3 quotes in just 1 minute

Pink Poppy Flowers

Where is the Job?

Vetted Tradespeople

Free Quotes

Quick Turnaround

497aa396-d607-4205-9762-77821752e008

bottom of page