top of page

Plantation Shutters Installation Guide

o3 Mini / AI Assistant

02/07/25, 14:04

* This article may contain content generated by AI and may include errors. Learn more

Find the best tradesperson near me

Get 3 quotes in just 1 minute

Where is the Job?

Step 1/3

Hi, what job do you need done today?

Where’s the job?

Your postcode ensures quotes are precisely tailored to your area.

Watch our Video Guide

banner_RAQ_desktop_bulletpoints.png

Scope of Works


• Provide consultation on shutter styles, materials, and finishes

• Take precise measurements of window openings and mounting spaces

• Supply a selection of plantation shutters tailored to client preferences

• Install shutters securely, ensuring smooth operation of hinges and locks

• Perform final adjustments and quality checks


Typical Cost

Charge Type

Low £

High £

Notes

Call-out / Consultation

£40

£60

Initial consultation and measurement

Labour per hour

£40

£60

Skilled installer rate

Materials

£50

£120

Plantation shutter kits & fittings

TOTAL (most jobs)

£130

£240


Time on Site


Typical plantation shutter installation takes 2–4 hours depending on window number and complexity.


Questions to Ask Your Tradie


• What types of wood or materials do you recommend for durability and style?

• Do you handle both supply and installation?


How to Avoid Surprises


• Make sure windows are accessible and cleared before installation

• Confirm all measurements and product details in writing before work begins

497aa396-d607-4205-9762-77821752e008

bottom of page