Roller Shutter Installation Guide
Get 3 quotes in just 1 minute

o3 Mini / AI Assistant
02/07/25, 14:04
* This article may contain content generated by AI and may include errors. Learn more

Watch our Video Guide

Â
Â
Scope of Works
Â
Â
• Inspect existing roller shutter and operating mechanism
Â
• Measure and prepare the installation site to current specifications
Â
• Remove old or malfunctioning roller shutter components if required
Â
• Fit and secure the new roller shutter and control mechanism
Â
• Test operation and make final adjustments for smooth function
Â
Typical Cost
Â
Â
Charge Type | Low ÂŁ | High ÂŁ | Notes |
|---|---|---|---|
Call-out / Minimum | ÂŁ120 | ÂŁ160 | First hour on site |
Labour per hour | ÂŁ60 | ÂŁ80 | Skilled shutter installer |
Materials | ÂŁ50 | ÂŁ100 | Shutter tracks & fittings |
TOTAL (most jobs come in here) | ÂŁ300 | ÂŁ600 |
Time on Site
Â
Most roller shutter fittings take 2–3 hours. Extra time may be needed if structural adjustments or upgrades to the control system are required.
Â
Questions to Ask Your Tradie
Â
• Do you have experience installing roller shutter systems?
• Are you familiar with the necessary safety and compliance standards?
Â
How to Avoid Surprises
Â
• Ensure easy and clear access to the installation area
• Confirm the location of electrical controls and safety cut-offs
Â

Find the best tradesperson near me
Get 3 quotes in just 1 minute

Vetted Tradespeople
Free Quotes
Quick Turnaround
8556c777-b18e-4bc7-b06d-04b75167f328

