Lead pipe removal

gpt 5 mini

01/10/25, 12:14

* This article may contain content generated by AI and may include errors. Learn more

Find the best tradesperson near me

Get 3 quotes in just 1 minute

Pink Poppy Flowers

Where is the job?

Hi, what job do you need done today?

Where’s the job?

Your postcode ensures quotes are precisely tailored to your area.

Watch our Video Guide

banner_RAQ_desktop_bulletpoints.png

 

 

Scope of Works

 

• locate incoming supply and identify extent of lead pipework

• isolate and shut off water, drain downstream pipework and make safe

• excavate external runs or expose internal runs to access lead pipe

• remove lead pipe and replace with new MDPE or copper supply and fittings

• pressure test new installation, flush and take a lead-sampling if requested

• reinstate surfaces (tarmac, paving or floor/wall chase) and remove waste, trades to wear PPE for contamination control

 

Typical Cost

 

Charge Type

Low £

High £

Notes

Call-out / Minimum

£80

£120

First 30 min on site

Labour per hour

£60

£95

Qualified plumber rate

Materials

£120

£450

MDPE or copper pipe, fittings and stopcock

Disposal

£40

£150

Soil and lead scrap disposal

Extras (e.g. road opening)

£0

£1,400

Road-closure/permit, tarmac or paving reinstatement, traffic management

TOTAL (most jobs come in here)

£600

£2,500

Typical domestic replacement including excavation and reinstatement

 

Time on Site

 

Most domestic lead pipe removals take 3–8 hours on site for a single run, with full external excavations and reinstatement extending to 1–2 days

 

Questions to Ask Your Tradie

 

• do you have experience replacing lead supply pipes and can you provide references

• will you liaise with the water company and obtain any required permissions

• what testing or certification do you provide after replacement (pressure test, sampling)

• how will you protect my property from contamination and do you use PPE for lead handling

• who manages reinstatement of surfaces and can you itemise that cost

• what insurance and warranty do you carry for excavation and pipework replacement

 

How to Avoid Surprises

 

• give clear access to the stopcock, buried runs and any loft or underfloor spaces

• check parking and space for excavation plant and tell your tradie about restrictions

• flag up any known services (gas, electric, fibre) and provide plans if available

• arrange permission for kerb or road opening well in advance if pipe runs under the highway

• keep pets and children away from work areas and ask about temporary water arrangements