top of page

Custom Casement Window Frame Costs 

o3 / AI Assistant

01/10/25, 16:19

banner_SRP_desktop_bulletpoints (1).png

Find the best tradesperson near me

Get 3 quotes in just 1 minute

Where is the Job?

Step 1/3

Hi, what job do you need done today?

Where’s the job?

Your postcode ensures quotes are precisely tailored to your area.

* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more

Custom Casement Window Frame Costs


Scope of Works

  • Confirm exact opening size & style from your measurements or a site visit.

  • Prepare joinery drawings and specify timber species, glazing thickness and ironmongery.

  • Machine and assemble timber frame, sash and drip beads; apply first‑coat preservative/primer.

  • Pre‑hang sash on hinges, check weather‑seal compression and fit espagnolette or cockspur fastener.

  • Supply the frame unglazed or with factory‑fitted toughened double glazing as agreed.

  • Deliver to site with fixing pack, packers and fitting guide for DIY installation.

Typical Cost (inc. VAT)

Charge type

Low £

High £

Notes

Call‑out / minimum

60

110

Measuring visit or workshop set‑up

Labour per hour

35

60

Average joiner rate Hamuch

Materials

240

600

600 × 900 mm timber casement incl. glazing GreenMatch.co.uk

Disposal

0

40

Off‑cuts & sawdust if site work needed

Extras (premium hardwood, paint finish, special ironmongery)

80

200

As selected

TOTAL (most jobs come in here)

£400

£900

Ready‑to‑fit small casement

Time on Site

Workshop fabrication takes 5 – 7 hours spread over a week (machining, assembly, coating, glazing).A brief 30‑minute drop‑off or measurement visit is the only on‑site time unless you request templating or finishing touches.

Questions to Ask Your Trade

  1. Will you supply detailed drawings for me to approve before cutting timber?

  2. What timber species and treatment class do you recommend for my exposure zone?

  3. Is the frame factory‑painted, primed only or bare wood—and how should I finish it?

  4. Are cills, trickle vents and ironmongery included in the quoted price?

  5. Can you pre‑fit double glazing and beads, or will I need to glaze on site?

  6. How long is your workmanship and timber warranty, and what maintenance voids it?

  7. Do you provide a tolerance guide and fixing pack so I can install without specialist tools?

How to Avoid Surprises

  • Measure the opening in three places (top, middle, bottom) and give the smallest width & height.

  • Confirm parking or clear workshop access for timber deliveries if the joiner visits to template.

  • Ask whether the frame comes with ventilation slots, draught seals and drainage grooves pre‑cut.

  • Check if you need to organise site glazing certification (FENSA/Certass) once the unit is installed.

  • Get a written, all‑inclusive quote (inc. VAT) covering drawings, labour, timber, glazing, ironmongery and delivery.


750396f6-663f-403f-acf7-abfc9e99486e

bottom of page