Scope of Works
• Remove existing door furniture and assess frame for rot
• Take down old door slab and dispose
• Fit new door slab, adjust frame, hinges and threshold for correct swing
• Install or re-fit locks, letterplate, draught excluder and other ironmongery
• Prepare surfaces, fill gaps and sand edges, then apply primer to both faces
• Apply 1–2 topcoats of exterior door paint, mask and protect adjacent areas, and leave site tidy
Typical Cost
Charge Type | Low £ | High £ | Notes |
|---|---|---|---|
Call-out / Minimum | £80 | £120 | First 30 min on site |
Labour per hour | £45 | £85 | Fitting and painting time |
Materials | £120 | £700 | Door slab, frame repairs, ironmongery, paint |
Disposal | £30 | £80 | Old door and packaging |
Extras (e.g. scaffolding) | £0 | £350 | Required for high access or scaffolding hire |
TOTAL (most jobs come in here) | £360 | £1,200 | Typical complete replacement and two coats of paint |
Time on Site
Most standard front door removal, fitting and painting jobs take 3–6 hours on site; drying time between coats can extend the overall completion to 1–2 days depending on weather and paint type
Questions to Ask Your Tradie
• Do you supply the door slab and ironmongery or do I need to buy them?
• Is your quote for supply and fit including primer, two coats of paint and materials?
• How many days will the job take including drying time and when will the door be usable?
• Will you make good or charge extra for frame repairs, rot treatment or structural work?
• Do you carry public liability insurance and can you provide a written quote and timescale?
• How will you protect floors, glazing and letterbox and what PPE will you and your team use?
How to Avoid Surprises
• Ensure clear access to the front of the property and nearby parking for the van
• Check if you need permission from freeholder, management company or local authority
• Agree where materials and waste will be stored and who removes the old door
• Confirm availability of an electrical supply for tools or advise if a generator is needed
• Plan for paint drying times and keep pets and children away until paint is fully cured