Find the best tradesperson near me
Get 3 quotes in just 1 minute
* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more
Scope of Works
• Inspect kit and site access, confirm parts and instructions
• lay out panels and hardware and check for damage or missing items
• assemble frame, walls and roof per manufacturer instructions
• fit doors, hinges, locks, shelves and internal fittings
• anchor or fix to base where required and adjust doors and seals
• treat or seal timber edges if requested and advise on maintenance
• clear packaging, remove small debris and demonstrate operation
Typical Cost
Charge Type | Low £ | High £ | Notes |
|---|---|---|---|
Call-out / Minimum | £50 | £100 | First 30–45 min on site |
Labour per hour | £40 | £70 | Single fitter; extra for two‑person lifts |
Materials | £0 | £120 | Fixings, anchors, sealant and small consumables |
Disposal | £20 | £80 | Removal of packaging or old shed parts |
Extras (e.g. delivery, two‑man lift) | £0 | £200 | Delivery handling, levelling or crane hire for large panels |
TOTAL (most jobs come in here) | £120 | £500 | Typical range for a single shed or a few flat‑pack cupboards |
Time on Site
Small flat‑pack cupboard: 1–2 hours; small garden shed with pre‑cut panels: 2–4 hours; larger sheds or jobs needing a second person, base levelling or part replacements: 4–8 hours. Factors that extend time include poor access, uneven base, missing/damaged parts and adverse weather
Questions to Ask Your Tradie
• do you include unpacking and packaging removal in your price?
• will you need a second person for large panels and is that charged separately?
• are you insured (public liability) and can you provide recent references for similar jobs?
• will you anchor the shed to the base and what fixings do you recommend?
• how do you handle damaged or missing manufacturer parts and any warranty work?
• do you provide a written quote and estimated start and completion times?
How to Avoid Surprises
• ensure a level, firm base is ready or ask for a quote to level the area
• check door and gate widths and remove obstacles for panel access
• reserve parking near the site and tell the tradesperson about permit restrictions
• unwrap and check delivery on arrival so damaged items are logged with the supplier
• keep pets and children away during assembly and ensure safe storage of sharp fixings
• ask about PPE and contamination handling if removing old treated timber or mouldy materials
68b2e772-65ea-4e89-89d9-e0dcf84cb9a6

