Find the best tradesperson near me
Get 3 quotes in just 1 minute
* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more
Scope of Works
• clear and remove turf, plants and surface debris from the shed footprint
• excavate and level area to required depth and form any falls for drainage
• compact subsoil and install geotextile membrane if specified
• supply, spread and compact hardcore, sharp sand or concrete pads as agreed
• set out and level timber bearers, concrete slabs or sleeper base to square the shed
• remove arisings and leave site tidy (disposal charged separately)
Typical Cost
Charge Type | Low £ | High £ | Notes |
|---|---|---|---|
Call-out / Minimum | £80 | £120 | First 30 min on site |
Labour per hour | £40 | £65 | Per operative, VAT‑inclusive |
Materials | £60 | £400 | weed membrane, hardcore, sand, concrete or timber bearers |
Disposal | £40 | £150 | soil and green waste removed offsite |
Extras (e.g. plant hire) | £60 | £300 | mini‑digger, plate compactor or additional deliveries |
TOTAL (most jobs come in here) | £240 | £1,000 | typical small bases to larger prepared concrete or hardcore bases |
Time on Site
Typically 2–6 hours for a standard 6×4 shed base with one or two operatives; larger bases, sloping ground, poor access or concrete pours can extend work to 1–2 days
Questions to Ask Your Tradie
• do you include waste removal or is that charged separately
• what base type do you recommend for my shed size and the soil on site
• will you compact to a specific spec and provide a short guarantee
• do you need vehicle or plant access and how much clear working space is required
• are there extra charges for sloping sites, drainage or locating buried services
• can you show insurance and public liability details before work starts
How to Avoid Surprises
• ensure clear parking and direct access for trades and any plant
• mark known underground services and tell the tradie about drains or cables
• agree the exact shed footprint and finished level before work starts
• secure pets and remove obstructions from the working area
• check any landlord, lease or planning restrictions before starting work
b22f3eba-8837-4b26-ac41-786f37d8dc2e

