Find the best tradesperson near me
Get 3 quotes in just 1 minute
* AI-generated content disclaimer: This article may contain content generated by AI and may include errors. Learn more
Stair Railing Installation
Overview
• Fitting newel posts, balusters and a handrail to provide safe support on a staircase.
• Skill level 3 / 5
• Typical duration: 4–6 hours
Safety First
Use a sturdy work platform; never stand on loose treads.
Wear eye and hearing protection when cutting timber or metal.
Fit dust mask when sanding or drilling masonry.
Keep stairway clear of off‑cuts and tools to prevent trips.
Isolate nearby electrics if drilling into stud walls.
Tools & Materials
Item | Purpose |
Tape measure & carpenter’s square | Accurate layout |
Spirit level & plumb line | Aligning posts and rail |
Drill/driver with wood & masonry bits | Fixing screws and anchors |
Countersink & pilot bits | Preventing timber split |
Mitre saw or handsaw | Cutting rail ends & balusters |
Rail‑bolt kit / coach screws & resin anchors | Structural fixing |
Balusters/spindles & handrail | Main components |
Wood glue & PVA | Reinforcing joints |
Wood filler & sandpaper (120–180 grit) | Finishing |
PPE (goggles, mask, gloves) | Safety |
Step‑by‑Step
1. Measure the Stair Pitch
Why: Determines handrail angle and baluster cut length.
2. Mark & Fix Newel Posts
Why: Secure top and bottom anchor points give the railing its strength.
Pro‑tip: Use a story pole to transfer identical height marks between posts (1/3).
3. Cut Handrail to Length & Angle
Why: Accurate mitre or bevel ensures a tight, gap‑free fit to newels.
4. Install Handrail Brackets / Rail Bolts
Why: Mechanical connectors lock the rail solidly to posts.
5. Prepare & Fit Balusters
Why: Evenly spaced spindles prevent falls and meet 100 mm gap rule.
Pro‑tip: Pre‑drill pilot holes through the rail to avoid splits when screwing balusters (2/3).
6. Secure, Plumb & Level
Why: Final alignment removes twist and squeaks.
Pro‑tip: Apply a dab of wood glue at each baluster base before pin‑nailing for extra rigidity (3/3).
7. Fill, Sand & Finish
Why: Smoothing and sealing protect the timber and create a professional look.
Completion Checks
Handrail height 900 – 1000 mm and parallel to pitch.
No spindle gaps exceed 100 mm; all feel rigid under hand pressure.
Posts plumb; rail joints tight with no wobble.
Screw heads filled and sanded flush; finish coat even.
Stair treads clear, clean and undamaged.
When to call a pro instead
If the staircase is winding, requires structural alterations, connects to a listed‑building balustrade, or you lack the specialized tools to cut precise mitres in hardwood or metal, a qualified joiner can ensure Building Regulations compliance and a flawless, long‑lasting finish.
a5ec4c54-a7c4-49d8-9a63-c02699f38814

