top of page

Beer dispenser repair

gpt 5 mini

01/10/25, 12:14

* This article may contain content generated by AI and may include errors. Learn more

Find the best tradesperson near me

Get 3 quotes in just 1 minute

Pink Poppy Flowers

Where is the job?

Hi, what job do you need done today?

Where’s the job?

Your postcode ensures quotes are precisely tailored to your area.

Watch our Video Guide

banner_RAQ_desktop_bulletpoints.png

 

 

Scope of Works

 

• Inspect dispense head, tap, keg coupler, gas lines and cooling unit to identify fault (eg slow pour, foaming, leakage)

• Isolate CO2/N2 and electrical supplies and test regulators and pressure settings

• Replace worn seals, O-rings, tap cartridges, couplers or damaged beer line sections

• Check and repair cooling components including compressor, condenser and glycol circuits

• Pressure test for leaks, check gas purity and run test pours to calibrate pressure and temperature

• Document findings, fit replacement parts if available and provide a written quote for further work

 

Typical Cost

 

Charge Type

Low £

High £

Notes

Call-out / Minimum

£80

£150

First 30–60 min on site

Labour per hour

£45

£85

Qualified technician rate

Materials

£20

£220

Seals, lines, regulators, pumps or specialist parts

Disposal

£0

£40

Old parts and small appliance disposal

Extras (e.g. scaffolding)

£0

£150

After-hours, specialist refrigerant handling or rush parts

TOTAL (most jobs come in here)

£140

£430

Typical single-visit repair including parts and 1–2 hours labour

 

Time on Site

 

Most straightforward repairs take 1–2 hours on site; replacing compressors, re-piping lines or major refrigeration work can take 3–6 hours. Ordering specialist parts typically adds 2–7 days for return visits. Tight cellars, long beer-line runs or restricted venue access will extend time on site

 

Questions to Ask Your Tradie

 

• Do you have experience with my dispenser brand and model?

• Will you isolate gas and electrical supplies and confirm safe working procedures on site?

• Do you provide a written quote that separates labour, parts and any call-out fee?

• What warranty do you offer on parts and labour and is refrigerant work covered?

• Will you clean and flush the beer lines and run test pours after the repair?

• Are there extra charges for evening or emergency call-outs?

 

How to Avoid Surprises

 

• Provide make, model and a photo of the dispenser before the visit

• Ensure clear access to the cellar or bar back area and move kegs if requested

• Confirm parking or loading bay for the van and any vehicle restrictions

• Tell the tradie about site rules for food-safe work and any PPE you require

• Keep pets away and note any restricted working hours or noise limits

df4f3210-6862-4697-8490-4b19b3244fa4

bottom of page